Some of our projects

Garland W.A.N.

  • TSU One installed 16 miles of over head and underground fiber optic cabling allowing for high speed internet access for the residents.

Brazos Ridge Estates

  • 4,000’ of 6” SDR-21 PVC.
  • 2,000’ of 4” SDR-21 PVC.
  • 45 water services.

Rocky Creek Ranch

  • Installed 37,000’ of ditch and conduit.

  • 15 PMH-9 switch-gears.

  • 113,000’ 1/0 primary.

Watter Creek

  • 1,000’ of 6” Poly gas pipe.

  • 6,000’ of 4” Poly gas pipe.

  • 10 service connections.

Underground services

  • 52,000 Electrical services installed in the past 3 years.

  • Ongoing leak repair and replacement for ATMOS.

Dripping Springs, TX

  • Installed over 5 miles of gas piping to serve the City of Dripping Springs that previously did not have natural gas available.

  • Installed natural gas and electric infrastructure for more than (150) new sub-divisions.

Hwy 121 “Sam Rayburn Toll”

  • Relocated over 13,000’ of gas pipe.

Marlin, TX

  • Installed over 17 miles of 6” gas pipe.

North Tarrant Express “NTE"

  • Relocated over 4 miles of gas piping.

Frost, TX

  • Installed over 1 mile of PA11 pipe.